NEW CONSTRUCTION
The Barkley Estates New Construction
Committee ("BENCC") which is composed of 3
memebers initially appointed by the company,
will address all aspects of new construction in
Barkley Estates to assure conformance with its
guidlines, and to amitain the high standards
for construction of residental dwellings and
other structures within the community. In this
connection, the BENCC has established a
process and procedure for reviewing all
individual buidling and landscape plans for
new homes. The BENCC will review all plans
and specifications, and, after its review, will
either approve such plans and specification or
disaprove, with recommended modifications as
needed to meet its requirements. The
purpose of this review process is to insure that
the proposed resifential dwellings and other
structures will refect positively upon and will
benefit the site, adjacent areas, and the
residential community as a whole.
Click each link for the appropriate content
Barkley Estates
Community Association

MODIFICATIONS
The Barkley Estates Modifications Committee (BEMC)
was established in accordance with the Design and
Construction guidelines in 1994 to provide a process
and procedure for reviewing all proposed
modifications to existing dwellings and other property
improvements. BEMC will review all plans and
specifications that meets its requirements. After its
review, the committee will either approve or deny the
Modification request.
The purpose of this review process is to insure that all
proposed modifications to existing dwellings or related
property improvements will reflect positively upon, and
will benefit the dwelling, site, adjacent areas, and the
community as a whole. A pre-application review of the
proposed modifications with a committee member
before committing to final plans or drawings is
recommended.
Formal application is required to be made to BEMC,
clearly illustrating specific plans and specifications
that show the nature, kind, shape, color, size, exterior
finish materials and location of all proposed structures
and improvements. {You can find detailed
requirements of formal applications in the
Construction Guidelines and Procedures Booklet}.
Each application will be time recorded, and will be
approved or disapproved with a notice of required
modifications within thirty (30) days from submission.
Disclaimer: Content printed, displayed,
stated on this web site is not meant to
replace, change or alter any recorded
documents or Declarations of the
association. If any discrepancies
occur, the recorded Declarations will
prevail.